Existing Block D lobby area in the Park and where we started from, a nice space and the first aspect of the Village you come into contact with and thus perfect for a OA Members reception area.
New electrical distribution panel |
42 inch plasma to be located here |
The first area of works was to get the new electrical services in, and to monitor this the new distribution board is fitted with a slave meter.
the new distribution board and lighting control is located behind the intended new reception desk are and will be with in cupboard unit.
Lighting is a key issue and we have allowed for an element of drama mixed with practicality and necessary task lighting.
With the new lighting arrangement in the walls where made good and the whole area re-painted.
With great high cielings for the main fittings we have gone for some very special hang lamps with a fabric finish for that warm tactile feel, over the reception desk a line of architectural fittings then LV down lighters for the task lighting behind reception.
For the reception desk we wanted to bring in some organic elements and introduce some traditional aspect creating a contemporary warm mix for the space. Here we see the pieces which i selected (actually rescued) from our timber suppliers yard being brought back to life, they had been there for years and no body had seen the beauty of them, but when Crown waved their creative and skilled hands over them , just look what they can become.
Putting her in the place you start to see the area take shape and the two styles start to blend.
The reclaimed wood looks very special and when we add the next elements will visually pop. The over hang is designed to act as a bar plot for members to enjoy a cup of freshly ground coffee at.
The Park Signage.
As with the reception area the concept for the signage was a blend of the traditional and the modern, in this the agreed wording and revised logo will be formed from 316 stainless steel, and these will be raise mounted on 3 hand selected forest totems, staggered in arrangement and mean to connect the complex with the Pirin Park area in front which the complex sits. We have designed in to the original logo a woodpecker image this is the red crested woodpecker indigenous to this region and found in the forest behind, in fact in early spring the unique sound of their activities, wood pecking can be clearly heard. Again we wanted to ground/connect the resort to the nature which surrounds it.
The raw material. |
Putting in place the huge tree trunk elements |
At Crown its team work that counts, and we have a great team. With the logs in there predetermined position levelled and secured, we are ready for the pre-mixed cement to arrive. |
On time and as requested the pre-mixed cement arrives. |
The mix is well set into the retaining hole and a small part is also formed to take the up lighter for the sign. |
With the cement properly cured over the weekend, the levelling retainers are removed so above ground treatment can be applied, the ground around made good the up-lamp fixed and tested, ready for the signage to be installed.